Surviving the Reboot and Failover Testing
Failover Testing
Confirm that everything is functional:
- 
Ensure that the GuardPoints are all operational.
 - 
Ensure that you receive valid results when you query the database.
 - 
Verify that the load order ensures that CTE starts before ASM.
 
Once verified, you can start the failover testing for each RAC Node.
- 
Reboot the RAC Node 1 and monitor the startup.
 - 
Once the restart is clean, reboot RAC Node 2 and monitor the startup.